Double door sets and old metal windows were replaced under a major contract carried out by West Leigh as part of the refurbishment of a north London primary school.

West Leigh utilised the well-proven W20 frame members to fabricate a selection of top hung vents, with those installed at higher level utilising Teleflex gearing for remote operation. The new double doors were all fitted with panic bars to ensure safe emergency egress. All of the 16 mm insulating glass units featured a 4 mm soft coat low-E inner leaf with a Krypton gas fill, in order to meet the current standards of Part L of the Building Regulations. All of the W20 frames were hot-dip galvanized and finished with a RAL 9920 polyester powder coat in white semi-gloss.